SAP Project Experience

Commonwealth Bank of Australia
Core Bank Modernization (Feb 2009 – Dec 2010)
Technology consultant
The customer is migrating the entire infrastructure to a new hardware platform and SAP applications.

  • Implementation of the SAP end-state infrastructure
  • OS/DB Migration AIX+DB2 LUW to AIX+DB2 on z/OS
  • SAP Banking upgrade from 6.0 to 7.0
  • SAP PI implementation in a high-availability scenario
  • Transport optimization
  • OpenText archiving solution – installation and configuration
  • F5 development support
  • Vintela (Quest) AD integration project review

Schneider Electric
Installation & configuration of SAP HPQ Adapter (Oct 2008)
Technology consultant

  • Planning and Preparation
  • Installing SAP add-on for HP Quality Center: ST_QCA

SAP GDC India
Installation of HP Quality Center platform (Dec 2008)
Technology consultant

  • Planning and Documentation
  • Installing and patching Oracle 10.2.0.2
  • Installing SAP Solution Manager and configuring the interoperation with HP QC
  • Installing SAP add-on for HP Quality Center: ST_QCA
  • Installing and configuring HP Quality Center and the Quality Center Dashboard

Bystronic Glass
CUUC (Sept 2008 – Dec 2008)
Technology consultant

  • Upgrade SAP R3 4.7 to ECC 6.0 with Unicode conversion